Wednesday, September 24, 2008

tessellation


hey team was just having a quick squiz at fed square and their patterning.
as you can see from the pic above they use the same basic shape all over but thy change the colour/material to give a pattern. i'm just thinking that we should do te same thing to make it easier, instead of trying to fit different shapes and sizes together.
have a look and decide for yourself.
have a good one, i'll see you next week

Saturday, September 13, 2008

progess



lads (and ladies)


Don't think we have mentioned the name for the boutique hotel- it is known as GRID mostly due to the urban surroundings and construction of floor plates resembling a grid.


Its been a while architecture fans- just writing to say we have a) met the structural engineer for the first time- he was happy with the building structure, suggested a few minor changes- would like us to thicken the beams, not chamfer the slab. b) talked to Terry- he has suggested doing a few more sections in order to describe what is going on in the building and c) had a talk to james- he introduced the idea of "tessellation" for our screen which will give it more character. One massive setback though has been the realization that the majority of rooms in the building face south (devo) this will have to be discussed further and in detail in order to come up with a compromise.


ps- that screen was originally 1.5m from the slab- can you kids remember why we changed it?



if keen to catch up today give us a dingle

on that note- stay safe

Sunday, September 7, 2008


HERZOG- screen?

Legends...have made a few amendments and am still in the process of smashing them out. have had a small chat with Timmy about the possibility of using sheet music as the basis for our screen (get some Mozart or Britney or anything really, enlarge and work out perforations for the notes -emboss, puncture extrude etc. what are your thoughts lads?




Am close to the end with these amendments, will be in at you-and-i-versity tomorrow for the whole day [probably in studio] get involved if not working. Glenny will definitely have revised plans up by tomorrow- probably lunchtime.




Timmy you are on the screen- details and concepts


Glenny- room (sections)


Benny- on details, joinery, operable windows


Samuel George- making amendments to sections plans and elevations




will hopefully catch you punks tomorrow


for now here is some inspiration- ps spelling has been checked the american way= the wrong way
TOYO ITO- (interiors?)


Saturday, September 6, 2008

progress

hey there sam, just wondering how those drawings are going?

when your finished just throw em up on the gmail and i'll organise them all.

catch yas

Monday, September 1, 2008

standards

team,

while the report we handed up on thursday is mostly useless the one important thing is the standards. theres a copy on the gmail account. downlaod it and keep a copy on you.

have a read through, if you dont understand any bits or think something is bullshit then tell me and we'll look at changing it.

catch yas